The Silent Cost of Poor Systems in Renewables
- Leanne Ramage

- Jul 31
- 3 min read
Updated: Oct 21

Sometimes it takes just one small thing to expose the cracks in the systems we rely on too much: a missing induction, a lost worker order.
If you’re the one responsible for keeping operations on track, you’ve probably seen this first-hand. A worker arrives on site without any valid induction. No access granted, the work is delayed, and your team is disrupted. A work order is missed because it got lost in someone’s inbox! They don’t sound like massive issues, but it’s not the first time this has happened.
Every week it’s something else! the delays add up, manually checking paper records, phone calls to try and get information, back and forth emails. For teams that are already spreads thin, these moments add up. They drain hours over the course of a project’s life.
Why are we still working like this?
The real problem isn’t your team, it’s the systems they’re forced to work with. Many renewable energy projects still rely on paper-based inductions, spreadsheets for tracking access, shared drives for procedures, and messaging apps for sending out critical updates. These tools were never designed to work together, and they weren’t built for the unique demands of the renewables sector. As a result, even simple tasks become frustratingly complex. Delays creep in, information gets lost, and teams spend more time managing systems than getting the job done. Choosing not to address these inefficiencies might feel easier in the moment, but it comes at a cost. Margins shrink, compliance becomes harder to maintain, and your team is left dealing with the stress of constant workarounds. The longer these issues are ignored, the worse they get, until a small inefficiency turns into a major setback. Making a change means less friction, fewer mistakes, and a system that supports the way your team works.
Built for renewables, by people who get it
You don’t need another generic system; you need a partner who understands renewable operations from the ground up. You need a system that is built for renewables, a system that’s built off the back of years of experience in the industry, working on the field, working in the control rooms. The team at KUDO have a collective 200+ years of experience in the sector and know the problems you’re facing all too well.
KUDO offers a variety of tools to suit your needs, with a customisable platform that allows you to simply add what you need.
Inductions are easily completed on the mobile app, with workers getting notifications beforehand to ensure you don’t have anyone turning up to site without the proper inductions in place.
Access records are easily maintained with workers booking on and off site using the mobile app.
Work orders are created within the web portal and personnel onsite can access and start work within the app, meaning that no work order will be missed.
Work management allows control room operators to track and manage the status of work orders, making sure there’s no time wasted going through paper records.
Get set up without the hassle
So, the plan is straightforward, and it’s clear what anyone in this kind of situation needs to do. Organise a demo of the KUDO platform, select the features that you need to improve operations, and get it rolled out on your sites. There's no massive onboarding, no waste of time, just clarity and simplicity.
See the impact
Within a week you’ll be able to see the impact. Personnel will be arriving on site pre inducted, access logs are updated and recorded automatically, work orders will be able to flow without bottlenecks.
Your workers will be safer, and more supported, and you will be more compliant and audit ready than ever before.
Book a demo now to get started!

